The new shop was absolutely fantastic, being on the main road it's really accessibleRichard Shaw,
Lidl operations manage
The supermarket, in Nottingham Road, replaces the German firm’s Meteor Centre site, which has now closed. Ten jobs have been created by the move to the larger site, which measures up at 15,000sq ft.
The workforce now totals 40.
Role
- Pre Planning Civil Engineer
- Section 278 highway access design and contract administration
- Design of external levels and gravity drainage
- Flood Risk Assessment
- Post construction safety audit of the highway works
Client
Lidl GmbH
Contractor
WS Construction
Architect
Nichol Thomas
Duration
3 Months