Project delivered on time and under budgetClive Roddick
Network Rail required an inspection pit, canopy and accommodation block and support facilities to enable the maintenance of rolling stock at the existing HOOB maintenance depot at Toton sidings.
The design was in accordance with guidance from Network Rail and Design Forms 2 and 3 were submitted as a single submission.
Role
- Reinforced concrete design and detailing
- Intrusive ground investigation
Client
Network Rail
Contractor
Construction Marine Ltd
Project Description
Design and detailing of inspection pits at maintenance depot.
Duration
3 months