Students are proud to attend Trentham High School. They and their parents say they feel safe in schoolOfsted, October 2013
A number of key buildings and facilities at Trentham High School were remodelled and reconfigured as part of a redevelopment in 2013 to create a school fit for the 21st century. The scheme involved remodelling the existing technology block and the science upper floor to form attractive teaching spaces. The project also included upgrading the existing swimming pool changing facilities.
In addition, the grounds around the school were given an upgrade, with a new covered area over a remodelled courtyard and improvements to access routes to link different levels and make it easier to get from area to area.
Role
- Structural engineering - remodelling of existing buildings
- Design and detailing of drainage
- Reconfiguring access routes in and around the site buildings
Client
Wates Construction
Contractor
Wates Construction
Architect
Associated Architects
Project Description
Improvements and upgrades to the buildings and grounds of a secondary school in Stoke-on-Trent
Value
£3,000,000
Duration
18 months